ON-SITE SPRAYING SPECIALISTS

ON-SITE SPRAYING SPECIALISTS

Industrial Flat Roof Repair | Birds Eye

Birdseye Factory, Lowestoft

DO YOU HAVE A PROJECT YOU’D LIKE TO DISCUSS? GET IN TOUCH

Our Gallery

Industrial Flat Roof Repair at Birds Eye Factory

The flat roof above the evaporation room at the Birds Eye factory in Lowestoft had a number of problems. The existing felt coating had large cracks and splits throughout the surface, which were causing water ingress into the factory below. There were areas of heavy vegetation growth and significant damage to the concrete structure.

As part of our industrial flat roof repair service, we not only applied a new flat roof coating, but carried out other necessary remedial work, including:

    • Pressure washing to remove all moss, algae and other vegetation
    • Removal of concrete sills around the bottom of service machinery
    • Masonry repairs to edges and up-stand

There were a number of difficult to access areas such as underneath air conditioning systems and other services, as well as issues with pipework, which was constantly dripping onto the roof. These problems provided a number of obstacles that needed to be addressed during the preparation and coating process.

A coating specification was provided by one of our preferred coating manufacturers, Tor-Coatings and the work was checked by a Tor-Coatings technical paint inspector at all stages of the job.

Despite a challenging level of repair, the work was completed successfully, using Tor-Coatings Elastaseal Z coating system with an anti-slip finish, providing a 25-year warranty, and peace of mind for Birds Eye that the long term integrity of the roof was secure.

WANT TO KNOW MORE?

To find out more about the services we offer, including intumescent coatingsepoxy floor coatings and cladding spraying, take a look here.

GIVE US A CALL ON: 01603 405318

Or email us and we will be more than happy to assist you: enquiries@cladspraysolutions.co.uk

What our customers say…

David Doherty – JST UK Ltd

From start to finish the project was managed really well with Dan and Ben in regular contact, plenty of information on what would be happening and when. We are really happy with the look of our building now the work is complete, it looks as it did when it was first built 30 years ago.  There were two operatives that did most of the work, Stuart and Travis. Really hard working and focused on giving us a great finish and that is exactly what we got. I would be more than happy to recommend Cladspray to any one needing this type of refurbishment work done and we will be using them again ourselves in the future.

Sean Carter – Rose Builders

Very pleased with the initial attendance by Dan Ruegg to discuss the project ahead of tendering. Response to queries and resolution of resolving a few issues was very positive. The site team were very polite and professional, would definitely use again.